
Hydrogen Maritime Transport Expert
YOUR FUTURE BEGINS HERE
Job Description
Implementation and operation of a pusher vessel combining a battery and a fuel cell in freight transport. This vessel will replace an existing working boat operating in the Parisian Urban node and substitute.
Specific Objectives
1. Life Cycle Analysis
2. GHG emissions avoidance calculation
Advisory tasks to be Performed under the Services
Task A. GHG emissions avoidance calculation
i. Delivery of a process diagram, showing the boundaries of the system, inputs and outputs
a. Description of the process in the reference and project scenarios.
b. Definition of the process diagram
c. Description of the LCA goal and scope, system, boundaries, and processes to be analysed, considering but not limited to life of the product, upstream and downstream processes, and processes associated to the production.
ii. Definition of the overall inventory analysis
a. Description of the data collection strategy and information sources.
b. Definition of the functional unit.
c. Definition of the raw materials, fuel consumption, water consumption, and emissions, including references.
d. Identification of the ETS benchmarks, following the EU ETS Directive5
iii. Independent Life Cycle Analysis (LCA), in line with the ISO standards.
a. Definition of the software, methodology, assumptions, and limitations.
b. Definition of the inputs and outputs. Assumptions will be described, for example, considering current and upcoming relevant national and EU legislation and/or regulations (e.g. EU Taxonomy).
c. Definition of impact categories
d. Quantification of impact categories. This will include but not limited to a classification of the resource use and emissions generated according to their potential impacts and a quantification of those under the defined impact categories, which will be assessed in terms of their relative importance within the LCA goal defined previously.
iv. GHG emissions avoidance calculation, including the reference and project scenarios. Assumptions will be included
a. Delivery of defined reference and project scenarios based on the ETS benchmarks and the outputs of A(i)-A(iv).
b. Calculation of the absolute and relative GHG emissions avoidance.
c. Delivery of the process diagram
d. Analysis and interpretation of results, including a discussion of the results in terms of contributions, relevance, robustness, data quality and limitations. Assumptions will be described, and references will
be included where required.
e. Delivery of report and documentation
Available documentation
•Original GHG calculations, consumptions, mass and energy balances where required, and process diagrams.
•Project documentation, and an update with the latest project information, including hydrogen sourcing
Key deliverable
Inception Report: Description of the software, methodology, data collection, assumptions and limitations. (Expected timeline: 0.5 months after the Effective Date)
Report on Task A: Report progress for Task A. The consultant shall describe the processes, boundaries, LCA scope and goal. The report will include the Overall inventory analysis, LCA, and the GHG emissions calculations considering the reference and project scenarios (Expected timeline: 2.5 months after the Effective Date)
Final report: Final Report, including modifications based on feedback provided by the Client (Expected timeline: 3 months after the Effective Date)
Job Requirement
Person Specification
Experience and Qualifications
· At least 15 years of relevant experience in the energy or industrial or maritime sectors- Minimum requirement
· At least, 5 years of experience in the shipping or maritime sector- Minimum requirement
· Experience in the hydrogen production sector or hydrogen storage or hydrogen-based systems would be an advantage
· Experience in hydrogen applications in the shipping sector would be an advantage
· Experience on risk analysis applied to the shipping sector would be an advantage
Skills
· At least a Master’s Degree (or equivalent professional qualification) preferably economics, engineering or business administration – Minimum requirement
· Fluent in English (CEFR C1) – Minimum requirement
JOB CATEGORY
Hydrogen
LOCATION
Europe
JOB TYPE
Researcher
Type of Project
Feasibility Studies
SALARY
Competitive Rates which will vary depending on candidates' experience and certification
REFERENCE NUMBER
#2223
About Us

We are an association formed of experienced recruitment consultants, with over 15 years of experience in assisting Manufactures, Owner, Operators, Utility companies, as well as with Service providers in finding personnel that best fit with their unique business needs
Each of our associates is specialised in a very specific niche within the Renewable Energy Sector. That means that, we will assign a recruiter who is specialised in the niche Market you operate. As a result, we provide expert advice and reduce your time-to-hire.
We are ideally positioned to work proactively with talented professionals in order to secure the market's leading opportunities and give our clients the most needed edge in a competitive marketplace.